INTRODUCTION

  • Michael Baker International Team – Top 5 Bridge Consulting Firm
    • Tony Cabrera, PE – Project Manager
    • Russell Moore, PE – Senior Roadway Design Engineer Lead
    • Tom Ritz, PE  - Bridge Engineer Lead
    • Kevin Kugler, AICP – Transportation Planner/Public Engagement Lead
    • Zsalina Allen - Project Planner
  • Supporting Team Members
    • Kevin Murphy, PE, NV5
    • Kittelson & Associates

BACKGROUND/HISTORY

  • Lake Havasu City has entered into an Intergovernmental Agreement with the State of Arizona (ADOT) to accept the state-appropriated funding of $35,500,000 for the study, design and construction of an emergency evacuation route second bridge.
  • This Feasibility Study is the first step in this process, as required by SB 1722.
  • Lake Havasu City has also entered into Memorandums of Understanding (MOU) with the Arizona State Parks Board (1997 & 2019) to exchange properties for the improvement of Lake Havasu State Park and reserve right-or-way across Parks property for a future roadway approach and second bridge.
  • Lake Havasu City has also entered into an agreement (2007) with the Arizona State Land Department to obtain right-of-way for the improvement of a roadway and utilities across ASLD lands on the island.

SECOND BRIDGE FEASIBILITY STUDY PURPOSE

To meet the legislative requirements of SB 1722 (55th Legislature) by conducting a feasibility study to analyze and recommend preliminary design options and cost estimates for a second bridge and roadway approaches in advance of the design and construction of these improvements, as authorized and funded by the Arizona Legislature.

SECOND BRIDGE FEASIBILITY STUDY CONSIDERATIONS

  • Enhance Public Safety including identification of an emergency evacuation route
  • Improve Traffic Operations/Reduce Congestion at Peak Periods
  • Develop, analyze and report on roadway and bridge alternative concepts, including:
    • Bridge Structure Type/Architecture
    • Roadway Approach Concepts/Alternatives
    • Bridgewater Channel Impacts
    • Public/Stakeholder Input
    • Environmental Overview (high level)
    • Utility Conflicts
    • Minimize Impacts to Adjacent Property Owners
    • Multimodal Operations/Infrastructure

STUDY AREA COMPONENTS

  • US 95 Connection
    • Palo Verde Blvd.
    • Willow Wash
    • Paseo del Sol Ave.
  • Roadway Approach
    • Transition area; existing roadways to new roadway alignment
  • Bridge Crossing + Island Roadway
    • Bridgewater Channel bridge crossing
    • New island roadway alignment and connection to McCulloch Blvd.
Study-Area-Components

SECOND BRIDGE FEASIBILITY STUDY PROCESS

Study Process

SECOND BRIDGE FEASIBILITY STUDY: NEXT STEPS

  • Traffic Analysis
  • Roadway and Utility Analysis
  • Preparation of the Conceptual Alternatives